Crane setup in Zone B
The lift plan fixes where the crane stands. Every other control is built around that position.
Site conditions change. ControlDrift compares each change with the controls you approved, explains which ones may no longer hold, and routes them to a competent person.
Approved state · Version 1
Lift Operation 104 — lift plan
Reported site change
“The crane has been moved approximately 8 metres east because the planned setup area is unsuitable.”
Chris Doyle · Slinger Signaller · just now
Review required · routed to Appointed Person
ControlDrift flags · a competent person decidesC-01 Crane setup location: Zone B.
C-02 Exclusion zone: 6 m around operating area.
C-03 Vehicle access route: Gate 3.
C-04 Lift sequence: A → B → C.
How it works
Approved state, site change, drift check, human revalidation — the same loop for every high-risk activity.
One change, end to end
C-01 to C-04 confirmed as Version 1 for Lift Operation 104 by the site supervisor.
“Crane moved approx. 8 m east to Zone B because the original pad is blocked.”
C-01 affected, C-02 and C-03 potentially affected, C-04 no impact identified — each with a reason.
The reviewer confirms, amends or holds each flagged control. Notes are mandatory.
Version 2 is created, Version 1 stays readable, and every step is in the audit chain.
The problem
Built from first-hand experience in lifting operations on major UK infrastructure — where the approved plan and the conditions on the day don't always match.
RAMS, lift plans and permits reflect the people, equipment, location and sequence agreed on the day.
Equipment is relocated, access changes, ground conditions shift. Small changes rarely trigger a formal review.
Everyone assumes the old control still applies. ControlDrift makes the difference visible before work continues.
Human in the loop
Every flagged control shows the original control, the reported change and the reason side by side. The reviewer confirms, amends or holds — and every decision becomes a traceable version.
Walk through Lift Operation 104 end to end in under four minutes — or sign in with a demo account and try it yourself.
Construction change-control and safety assurance. Keeping approved controls aligned with real site conditions.